Monitor the progress of infrastructure projects

بلاغ إتمام عملية إسناد المساكن الإجتماعية

بلاغ إتمام عملية إسناد المساكن الإجتماعية المنجزة في إطار البرنامج الخصوصي للسكن الإجتماعي بولاية المنستير في جزئه المتكون من عدد 11 مسكن فردي بمعتمدية جمال و عدد 65 مسكن جماعي بمعتمدية الساحلين

بقية التفاصيل

Monitor the progress of infrastructure projects

As part of monitoring the progress of work on a number of infrastructure projects in the region and accelerating the pace of their implementation, today, Thursday 07 October 2021, the first approved in the State of Monastir, Tariq Al-Bakoush, accompanied by the regional director of equipment, housing and infrastructure, Rajaa Al-Ajili,

and the regional director of the National Office of Disinfection, Adnan bin Hussein, and in the presence accredited gentlemen and mayors of municipalities to inspect the progress of construction works for a water installation and a junction A roundabout on the regional road 93 connecting manzel Harb and Jammal to the local road 853 at the entrance of the town of Al-Masdour, for a cost 6.5 million dinars. The first commissioner was informed of the works of widening and strengthening of the road connecting Bembla and Banan at the level of Harkousiya over a length of 2 km, considering that it represents a dangerous bend and a black spot that causes many accidents, because it will be Thinking of creating speed bumps or limiting the speed to ensure the safety of road users.The first commissioner also inspected the preparation of the road and the creation of a circular junction at the level of Al-Nakhil in Skanes de Monastir, where the two projects are located within the framework of a national project of strengthening and preparation of 28 km in the state of Monastir d 'a value of 6.5 million dinars and The overall percentage of completion of this project was 60%.